PPAP: the 5 submission levels and 18 elements

PPAP (Production Part Approval Process) is the automotive procedure by which a supplier demonstrates that it understands all customer engineering requirements and that its manufacturing process can consistently produce conforming product at the quoted production rate. The process is defined in the AIAG PPAP manual; the current edition is the 4th.

When is a PPAP submission required?

The 5 submission levels

What does each level require?

Element12345
1. Design recordsRSS*R
2. Authorized engineering change documentsRSS*R
3. Customer engineering approvalRRS*R
4. Design FMEARRS*R
5. Process flow diagramRRS*R
6. Process FMEARRS*R
7. Control planRRS*R
8. Measurement system analysis (MSA)RRS*R
9. Dimensional resultsRSS*R
10. Material and performance test resultsRSS*R
11. Initial process studiesRRS*R
12. Qualified laboratory documentationRSS*R
13. Appearance approval report (AAR)SSS*R
14. Sample production partsRSS*R
15. Master sampleRRR*R
16. Checking aidsRRR*R
17. Customer-specific requirementsRRS*R
18. Part submission warrant (PSW)SSSSR

S = submit to the customer; R = retain at the supplier and make available on request; * = the customer defines whether to submit or retain.

Practical tips