shopfloormetrics.xyz
English
Home › Production & OEE

Production capacity calculator

Production capacity from cycle time, cavities, shift pattern and OEE: parts per hour, per shift, per day and per week.

Parts per shift
–pcs
Parts per hour (net)
–pcs/h
Parts per day
–pcs
Parts per week
–pcs
Theoretical maximum per shift
–pcs

How it works

Capacity follows from net shift time (shift length minus breaks), cycle time and the number of parts made per cycle. The OEE or efficiency factor accounts for real losses such as stops, slow running and scrap; at 100% you get the theoretical maximum.

Formula

Tnet = shift length − breaks
N = Tnet / CT × cavities × OEE

For injection moulding and press tools use the number of cavities; assembly lines usually make one part per cycle. If you do not know your OEE, a value between 60 and 85% is a reasonable assumption.

All calculations run in your browser; your inputs never reach us.

Related calculators