Takt time and cycle time calculator

Calculate takt time from available time and customer demand, plus the number of stations or operators needed, cycle time utilisation and daily capacity.

Takt time
–s
Takt time in minutes
–min
Stations / operators needed
–
Theoretical headcount
–
Cycle time / takt time
–%
Daily capacity
–pcs/day

How it works

Takt time is the pace at which one part must be finished to meet customer demand. Cycle time, by contrast, is how long the process actually takes per part. If the bottleneck cycle time exceeds takt time (a ratio above 100%), the line cannot meet demand.

Formula

Takt = (Tavail × shifts) / demand
Stations = ⌈work content / takt⌉
Capacity = (Tavail × shifts) / CTbottleneck

Dividing total work content by takt time gives the minimum number of balanced stations or operators. In practice, plan cycle times at about 85–95% of takt time to leave a buffer for small disruptions.

All calculations run in your browser; your inputs never reach us.